Skip to content
a rendering of a solar set up

August 15, 2019

Smart From the Start

Energy Modeling Empowers Designers to Know Now

Sunshine may be the last thing you think about when you’re planning a new office building. At Strang, it’s typically one of the first. You see, it’s in the earliest stages of design that Strang’s Energy Modeling has the greatest impact on making a building comfortable and efficient.

USING ENERGY MODELING SOFTWARE, STRANG ENGINEERS CREATED THIS RENDERING OF SUMMIT CREDIT UNION IN FRANKLIN, WI. IT SHOWS THE SIMULATED SOLAR ENERGY INTENSITY OVER A ONE-YEAR PERIOD AND THE IMPACT OF VERTICAL SHADING DEVICES.

ENERGY MODELING

There are many ways to measure the impact of the sun. Its warm glow does wonders for office morale, until it heats up the office like a sauna and you have to spend money cooling the air in the middle of winter.

It’s these sorts of considerations that are met head on with Energy Modeling, a unique software tool Strang employs at the earliest stages of every project to best meet the building owner’s objectives.

It does much more than just address solar issues. This suite of software programs allows our experts to identify, analyze, and select the most sustainable building forms, site orientations, materials, construction practices and engineering systems for a specific facility.

“For the best results, we like to consider these things before we settle on a particular form,” said Joss Hurford, Strang’s Director of Energy Modeling and Conservation.
Happy business man smiling at camera

Joss Huford
Director | Energy Modeling + Conservation

“Once the form of the building is determined, we’re limited with making improvements from energy modeling. ”
In all cases, energy modeling results are customized based on the type of facility, the size of the building and the site. And they mean much more when the results come early in the design process and changes can be considered.

Related News

For all the kids who enjoy playing with Legos…Strang partnered with Art + Lit + Lab to host students aged 11-14 at Strang’s Madison office to learn all about the world of architecture. As part of Art + Lit + Lab’s Summer Arts Camp, this program was all about teaching the fundamentals of architecture with interactive, hands-on learning.
Wisconsin Youth Symphony Orchestra recently broke ground on the construction of its new 40,085 SF rehearsal and performance space. The building will feature three state-of-the-art rehearsal halls, eight studios, nine practice rooms, administrative offices, and a music library. The music center is set to be fully operational in the fall of 2023.
When the U.S. Geological Survey (USGS), Water Mission Area (WMA) moved across town to the USDA Forest Products Lab building, they partnered with Strang to renovate the old, outdated 3rd floor into a fresh and collaborative space that spoke to the USGS’s core values. At 3,900 SF this office packs a lot of interesting features into every inch of the small space.